On this page
- How is commercial and flat roof drainage different?
- Which systems are used?
- Why does capacity matter in San Francisco storms?
- Where does the water go?
- What else matters on commercial jobs?
- Which terms come up?
- What should a commercial quote include?
- Flat roofs and commercial drainage: quick answers
- Which San Francisco areas see this most?
- Before the contractor arrives
- What maintenance do flat roof drains need?
- Who should you call for a larger building?
- What about mixed-use buildings?
- What should building owners keep on file?
How is commercial and flat roof drainage different?
The principle is the same, but the details differ. A typical San Francisco flat or mixed-use building has a flat or low-slope roof surrounded by a parapet. Water runs to one or more scuppers, which feed conductor heads and downspouts on the facade, or to roof drains piped down through the building. There may be no hanging gutter at all.
That design concentrates water. A single scupper may carry the runoff from an entire roof. If it blocks, water pools until it finds a way over the parapet, through a seam in the roofing or down an interior wall.
Which systems are used?
| System | Where it is used |
|---|---|
| Scupper and conductor head | Flats and row houses with parapet roofs |
| Internal roof drain | Larger flat roofs, newer buildings |
| Box gutter | Warehouses, older masonry, behind cornices |
| 6, 7 and 8-inch K-style | Pitched commercial roofs |
| 4x5 and larger downspouts | High-volume roofs |
Why does capacity matter in San Francisco storms?
Downtown San Francisco recorded 5.46 inches on December 31, 2022 and more than 10 inches over 10 days around the turn of that year. A flat roof sheds all of that through a few openings. Undersized scuppers and conductor heads overflow in exactly those storms.
Where does the water go?
San Francisco is the only coastal city in California with a combined sewer system, which collects and treats both wastewater and stormwater in the same network of pipes. In much of the city, building downspouts and roof drains connect into that system. Those connections need to stay clear; leaves and grit build up where they turn underground.
What else matters on commercial jobs?
Access. Tall facades over busy sidewalks may need lifts, scaffolding and sidewalk permits.
Tenants. Work is often scheduled around businesses and residents.
Historic fabric. Older buildings in Article 10 districts may need Planning review for visible changes.
Expansion. Long metal runs need expansion joints so seams do not tear.
Which terms come up?
| Term | What it means on a San Francisco house |
|---|---|
| Parapet | A low wall that rises above a flat or low-slope roof. Water runs to a gap or drain in the parapet instead of over an eave. |
| Scupper | An opening through a parapet that lets roof water out into a conductor head and downspout. Common on flat-roofed flats and row houses. |
| Conductor head | A box fixed below a scupper that gathers roof water and feeds the downspout. Leaves and grit collect in it. |
| Roof drain | A drain set into a flat roof, piped down through or along the building. When it clogs, water ponds on the roof. |
| Built-in gutter | A gutter formed inside the roof structure or behind a cornice and lined with metal. It is invisible from the street and expensive to neglect. |
| Combined sewer | A sewer system that carries stormwater and wastewater in the same pipes. San Francisco is the only coastal city in California built this way. |
| Downspout | The pipe that carries water from the gutter or conductor head to the ground or to a drain. 2x3 and 3x4 inch are the usual house sizes. |
What should a commercial quote include?
- Drainage type, size and material for each roof area
- Scupper, conductor head and downspout sizes
- Roof drain strainers and any repairs
- Connections to the sewer or other drainage
- Access plan, lifts and any sidewalk permits
- Scheduling around tenants
Flat roofs and commercial drainage: quick answers
| You might be wondering | The short version |
|---|---|
| Can a contractor work after hours? | Many can schedule around tenants |
| Are lifts needed? | Often, on taller fronts |
| Is copper used commercially? | On churches and older masonry |
| Do flat roofs need inspections? | Yes, at least before each rainy season |
Which San Francisco areas see this most?
| Neighborhood or city | What makes it relevant |
|---|---|
| Mission District | Mixed-use buildings and flats |
| Richmond District | Two- and three-unit flats |
| Potrero Hill | Modern flat-roofed homes |
| South San Francisco | Industrial and commercial buildings |
Before the contractor arrives
Gather a roof plan or a few photos of the roof before the visit. Knowing where every roof area drains lets the contractor size scuppers, heads and downspouts quickly and spot problem areas.
What maintenance do flat roof drains need?
Twice a year is a good rhythm for most buildings: once in early fall and once after the heaviest storms. Clear roof drain strainers, scuppers and conductor heads, check that downspouts and connections run freely, and look for ponding marks that show where water sits. A short written record of each visit helps property managers spot recurring problems.
Who should you call for a larger building?
Ask whether the contractor handles commercial drainage specifically. Larger roofs, lifts, sidewalk permits and tenant scheduling are different from a house job. Calls about flats, mixed-use buildings and commercial roofs are passed to contractors who take on that work.
What about mixed-use buildings?
Shops below and flats above are common across the city. Drainage that runs over a storefront entrance, or a conductor head that overflows onto a sidewalk, affects customers as well as residents. Rerouting downspouts away from entrances and sizing heads for the whole roof are common fixes.
What should building owners keep on file?
A simple roof drainage record helps: a sketch of where each roof area drains, the size of each scupper, head and downspout, the date each was last cleared, and any repairs made. When a new contractor or a new manager takes over, that record saves a site survey and shows which drains have a history of blocking.
| Term | What it means for larger buildings |
|---|---|
| Eave | The roof edge that overhangs a wall. On San Francisco row houses the front eave is often the only one, because side walls touch the neighbors. |
| Fascia | The trim board across the rafter ends where most exposed gutters are fixed. Sea air and wet winters soften neglected paint and wood. |
| Sewer lateral | The private pipe from a building to the public sewer main. In most of San Francisco, roof water from downspouts can drain into it, because stormwater and sewage share one system. |
| Downspout disconnection | Taking a downspout out of the sewer connection so roof water goes to a rain garden, barrel or cistern instead, with an overflow planned for big storms. |
